Follow the construction phases of the Bekatown settlement

Central place for all information about the progress of work, status of buildings, plans, and the latest visual materials. We transparently show how far we have come and what is next.

Status table by buildings

Phase 1
Earthworks (preparation and leveling of the terrain)
Phase 2
Foundation slab (Pouring the base and setting the foundation)
Phase 3
Roof structure (Roof installation and final fittings)
Phase 4
Interior works (Installations, partition walls, plastering)
Phase 5
Ready for occupancy (Final works, flooring, painting, cleaning)

Fortuna

Stadium

Sunset

Harmony

Garden

Solaris

SPA

Construction has not started (February 2026.)

Frequently Asked Questions

[ 01 ]
When is the completion of the construction of individual buildings planned?
See the table above – dates are regularly updated according to the dynamics of the work.
[ 02 ]
How can I check the status of a specific object?
Each object has detailed progress – click or check the “Object Status” section.
[ 03 ]
Can I get the latest pictures or video from the construction site?
Yes, the latest materials (photos, drone footage) from the field are available in the gallery.
[ 04 ]
Am I tracking the timeline of the development of the settlement somewhere?
This page contains a “progress bar” and a timeline of the entire construction, along with dates for each object.
[ 05 ]
What are the next phases of construction?
The construction of a second promenade, a spa center, and additional accommodation units is planned.
[ 06 ]
How can I contact the investor or get more information?
Use the contact details or the form at the bottom of the page.